Advancing circularity in the built environment requires harmonised methods for defining and managing Circular Economy (CE) indicators throughout the project lifecycle. This paper presents a structured survey-based investigation into current practices, data requirements, and digital workflows associated with CE assessment in construction. It also provides a survey-based investigation of stakeholder perspectives, data requirements, and digital workflows related to the integration of CE indicators into Building Information Modelling (BIM) environments. The survey engaged stakeholders from Portugal, Serbia, and Romania to examine barriers, data structures, and reporting needs associated with CE–BIM integration. The findings show that CE indicators are mainly assessed during early design stages, while lifecycle-wide BIM integration remains limited due to fragmented data structures, insufficient standardisation, and unclear regulatory guidance. Unlike studies focused mainly on technical BIM functionalities, this paper provides stakeholder-driven insights and policy-oriented recommendations to support future harmonisation of CE–BIM practices and lifecycle data management.

Integrating Circular Economy Indicators into BIM: Insights from a Stakeholder Survey

Sesana, Marta Maria;
2026-01-01

Abstract

Advancing circularity in the built environment requires harmonised methods for defining and managing Circular Economy (CE) indicators throughout the project lifecycle. This paper presents a structured survey-based investigation into current practices, data requirements, and digital workflows associated with CE assessment in construction. It also provides a survey-based investigation of stakeholder perspectives, data requirements, and digital workflows related to the integration of CE indicators into Building Information Modelling (BIM) environments. The survey engaged stakeholders from Portugal, Serbia, and Romania to examine barriers, data structures, and reporting needs associated with CE–BIM integration. The findings show that CE indicators are mainly assessed during early design stages, while lifecycle-wide BIM integration remains limited due to fragmented data structures, insufficient standardisation, and unclear regulatory guidance. Unlike studies focused mainly on technical BIM functionalities, this paper provides stakeholder-driven insights and policy-oriented recommendations to support future harmonisation of CE–BIM practices and lifecycle data management.
2026
9783032349293
9783032349309
File in questo prodotto:
File Dimensione Formato  
978-3-032-35104-3_ReSBE Vol2_2026_low.pdf

accesso aperto

Tipologia: Full Text
Licenza: PUBBLICO - Pubblico con Copyright
Dimensione 20.86 MB
Formato Adobe PDF
20.86 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11379/655810
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact