In the energy-intensive sector, energy consumption has gained great attention, because of the increasing of energy costs and environmental implications. The optimization of production scheduling in these firms becomes a strategic key in the energy costs reduction. This study focuses on the scheduling optimization of an inflexible system consisting of a two-machine flow-shop without any buffer in between. An algorithm for addressing the no-wait/blocking constrained problem is introduced with the aim of minimizing the total energy cost of the system. The proposed algorithm is applied to a real industrial case and the main results are shown.

Energy scheduling problem with no-wait/blocking constraints

Ferretti I.
;
Zanoni S.;Zavanella L. E.
2019-01-01

Abstract

In the energy-intensive sector, energy consumption has gained great attention, because of the increasing of energy costs and environmental implications. The optimization of production scheduling in these firms becomes a strategic key in the energy costs reduction. This study focuses on the scheduling optimization of an inflexible system consisting of a two-machine flow-shop without any buffer in between. An algorithm for addressing the no-wait/blocking constrained problem is introduced with the aim of minimizing the total energy cost of the system. The proposed algorithm is applied to a real industrial case and the main results are shown.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11379/529038
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 2
  • ???jsp.display-item.citation.isi??? ND
social impact