Determinization of finite automata is performed by the \emph{Subset Construction} algorithm (SC). However, some application domains, including monitoring and diagnosis of active systems in artificial intelligence, and model-based mutation testing in software engineering, require determinization to be performed incrementally, in real time. Making incremental determinization by means of SC is bound to poor performances. To this end, an algorithm called Incremental Subset Construction (ISC) was proposed a few years ago. Disturbingly, this algorithm was recently discovered to be incorrect is some instance problems. The incorrect behavior of ISC originates when the redirection of a transition causes a portion of the DFA to be disconnected from the initial state. This paper provides a revisited version of ISC, called Revised Incremental Subset Construction (RISC), operating in either busy or lazy mode. In busy mode, the disconnection is always avoided. In lazy mode, since no check of disconnection is performed, a garbage collector is eventually required.

Incremental subset construction revisited

LAMPERTI, Gian Franco;
2014-01-01

Abstract

Determinization of finite automata is performed by the \emph{Subset Construction} algorithm (SC). However, some application domains, including monitoring and diagnosis of active systems in artificial intelligence, and model-based mutation testing in software engineering, require determinization to be performed incrementally, in real time. Making incremental determinization by means of SC is bound to poor performances. To this end, an algorithm called Incremental Subset Construction (ISC) was proposed a few years ago. Disturbingly, this algorithm was recently discovered to be incorrect is some instance problems. The incorrect behavior of ISC originates when the redirection of a transition causes a portion of the DFA to be disconnected from the initial state. This paper provides a revisited version of ISC, called Revised Incremental Subset Construction (RISC), operating in either busy or lazy mode. In busy mode, the disconnection is always avoided. In lazy mode, since no check of disconnection is performed, a garbage collector is eventually required.
2014
Ateneo di appartenenza
Smart Digital Futures 2014
Neves-Silva R., Tshirintzis G.A., Uskov V., Howlett R.J., Jain L.C.
PE6_6 Algorithms, distributed, parallel and network algorithms, algorithmic game theory
Esperti anonimi
Inglese
Internazionale
ELETTRONICO
25
37
13
9781614994053
IOS PRESS
Amsterdam, NL
PAESI BASSI
Automata-based representation
2 Contributo in Volume::2.1 Contributo in volume (Capitolo o Saggio)
3
268
none
Balan, S. J.; Lamperti, Gian Franco; Scandale, M.
info:eu-repo/semantics/bookPart
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11379/431720
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 7
  • ???jsp.display-item.citation.isi??? 5
social impact