Hybrid power production facilities, based on the integration of renewable resources into conventional fossilfuel- fired power plants have gained a growing interest during the past decades due to a world-wide continuous increase of shares of the renewable sources into the electricity generation market. In fact, in spite of the variable nature of most of the renewable sources, the hybrid configuration may provide a more economic, sustainable, and reliable use of the renewables in all load-demand conditions compared to renewable singleresource facilities. Nonetheless, the question of what fraction of the electricity produced in such facilities is to be considered as generated from renewables, still remains not fully addressed. This implies that there is space for some arbitrariness in the quantification of the share of the produced electricity to be qualified for the subsidies granted to renewable electricity, as normally prescribed by most of the policies that promote the applications of renewable primary energy resources. To overcome this problem, in this work we first define the classical Single-Resource Separate-Production Reference allocation method (SRSPR) usually considered by the regulators which is based on reference partial primary energy factors that must be chosen by some authority as representative of the performance of the (best available or representative average single-resource) power production technologies that use the same renewable resource and the same fossil fuel as the hybrid facility. Then we propose a Self-Tuned Average-Local- Productions Reference allocation method (STLAPR) whereby the electricity allocation fractions are based on the energy scenario of the local area of interest that includes the hybrid plant itself. We compare the two methods for a case study consisting on the renewable-to-fossil allocation of the power produced in an Solar-Integrated Combined-Cycle System (SICCS) with parabolic trough solar field. It turns out that the differences between the classical SRSPR and the STLAPR method become significant as the hybrid facilities take on a sizable fraction of the production of electricity in the local area.

What fraction of the electrical energy produced in a hybrid fossil-solar power plant should qualify as 'renewable electricity'?

IORA, Paolo Giulio;BERETTA, Gian Paolo
2013-01-01

Abstract

Hybrid power production facilities, based on the integration of renewable resources into conventional fossilfuel- fired power plants have gained a growing interest during the past decades due to a world-wide continuous increase of shares of the renewable sources into the electricity generation market. In fact, in spite of the variable nature of most of the renewable sources, the hybrid configuration may provide a more economic, sustainable, and reliable use of the renewables in all load-demand conditions compared to renewable singleresource facilities. Nonetheless, the question of what fraction of the electricity produced in such facilities is to be considered as generated from renewables, still remains not fully addressed. This implies that there is space for some arbitrariness in the quantification of the share of the produced electricity to be qualified for the subsidies granted to renewable electricity, as normally prescribed by most of the policies that promote the applications of renewable primary energy resources. To overcome this problem, in this work we first define the classical Single-Resource Separate-Production Reference allocation method (SRSPR) usually considered by the regulators which is based on reference partial primary energy factors that must be chosen by some authority as representative of the performance of the (best available or representative average single-resource) power production technologies that use the same renewable resource and the same fossil fuel as the hybrid facility. Then we propose a Self-Tuned Average-Local- Productions Reference allocation method (STLAPR) whereby the electricity allocation fractions are based on the energy scenario of the local area of interest that includes the hybrid plant itself. We compare the two methods for a case study consisting on the renewable-to-fossil allocation of the power produced in an Solar-Integrated Combined-Cycle System (SICCS) with parabolic trough solar field. It turns out that the differences between the classical SRSPR and the STLAPR method become significant as the hybrid facilities take on a sizable fraction of the production of electricity in the local area.
2013
978-079185628-4
File in questo prodotto:
File Dimensione Formato  
IoraGhoniemBeretta-ASME-IMECE2013-66706.pdf

gestori archivio

Tipologia: Full Text
Licenza: NON PUBBLICO - Accesso privato/ristretto
Dimensione 592.28 kB
Formato Adobe PDF
592.28 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11379/441508
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? ND
social impact