Sfoglia per Autore  

Opzioni
Mostrati risultati da 1 a 20 di 69
Titolo Data di pubblicazione Autore(i) File
Comparing Inventory Replenishment Policies in a Reverse Logistics System 1-gen-2004 Zanoni, Simone; Tang, O.; Ferretti, Ivan
Closed-loop Supply Chain: ottimizzazione dei flussi produttivi e gestione delle scorte 1-gen-2004 Zanoni, Simone; Ferretti, Ivan; Zavanella, Lucio Enrico
Production-inventory scheduling using Ant System metaheuristic 1-gen-2004 Ferretti, Ivan; Zanoni, Simone; Zavanella, Lucio Enrico
Investigating the Bullwiph Effect of a hybrid stochastic manufacturing/remanufacturing system 1-gen-2005 Zanoni, S; Ferretti, I; Tang, O
New (R, S) class policies for hybrid manufacturing/remanufacturing systems optimal control 1-gen-2005 Zanoni, S; Ferretti, I; Zavanella, L
Multi echelon spare parts inventory optimization: a simulative study 1-gen-2005 Zanoni, S; Ferretti, I; Zavanella, L
Inventory policies for hybrid manufacturing/remanufacturing systems with different lead times and generally distributed demand 1-gen-2005 Zanoni, Simone; Ferretti, Ivan; Zavanella, Lucio Enrico
An investigation on e-procurement techniques and applications in SME’s 1-gen-2005 Ferretti, Ivan; Diana, Alberto; Zavanella, Lucio Enrico
Investigating the bullwhip effect of a hybrid stochastic manufacturing/re manufacturing system 1-gen-2005 Tang, O; Ferretti, Ivan; Zanoni, Simone; Zavanella, Lucio Enrico
Stato dell'arte sul e-Procurement nelle Piccole e Medie Imprese bresciane 1-gen-2005 Ferretti, Ivan; Zanoni, Simone; Zavanella, Lucio Enrico
A New periodic review inventory policy for hybrid manufacturing/remanufacturing systems 1-gen-2005 Zanoni, Simone; Ferretti, Ivan; Zavanella, Lucio Enrico
Comparison of two metaheuristic approaches for scheduling a painting line 1-gen-2005 Pasotti, Andrea; Ferretti, Ivan; Zanoni, Simone; Zavanella, Lucio Enrico
Multi echelon spare parts inventory optimisation: a simulative study 1-gen-2005 Zanoni, Simone; Ferretti, Ivan; Zavanella, Lucio Enrico
Lot sizing for inventory systems with multi-level item remanufacturing 1-gen-2006 Ferretti, I; Zanoni, S; Schulz, T
Optimization of a supply process for Biomass Combined Heat and Power (CHP) plants 1-gen-2006 Ferretti, Ivan; Zavanella, Lucio Enrico; Zanchi, Luca; Zanoni, Simone
LOT-SIZING DECISIONS IN A CLOSED-LOOP SUPPLY-CHAIN: MULTI-LEVEL COMPONENT REMANUFACTURING 1-gen-2006 Zanoni, Simone; Ferretti, Ivan; Schulz, T.
INVENTORY POLICIES FOR STOCHASTIC HYBRID MANUFACTURING/REMANUFACTURING SYSTEMS 1-gen-2006 Zanoni, Simone; Ferretti, Ivan; Tang, O.
Production–inventory scheduling using Ant System metaheuristic 1-gen-2006 Ferretti, Ivan; Zanoni, Simone; Zavanella, Lucio Enrico
Cost performance and bullwhip effect in a hybrid manufacturing and remanufacturing system with different control policies 1-gen-2006 Zanoni, Simone; Ferretti, Ivan; Tang, O.
Lot sizing within a random yield environment 1-gen-2007 Ferretti, I; Schulz, T
Mostrati risultati da 1 a 20 di 69
Legenda icone

  •  file ad accesso aperto
  •  file disponibili sulla rete interna
  •  file disponibili agli utenti autorizzati
  •  file disponibili solo agli amministratori
  •  file sotto embargo
  •  nessun file disponibile